Facades that create value

Facade HPL panels and turnkey ventilated facades in Tashkent

Facade reliability starts behind the panel. We select the subframe, insulation, membrane and fasteners as one system with the HPL panels. Turnkey installation, 12-month installation warranty; technical supervision — a European technical approach, under the contract.

Full cyclemeasurement → design → supply → installation
12 monthsinstallation warranty
Technical supervisionEuropean technical approach — on request
→
Facade anatomy

Eight layers of one system

Tap a layer — we’ll explain why it is needed and what we build it from. Quantities are per 1 m² according to UZHPL calculation.

The diagram is an illustration. The design, substructure spacing and loads are determined by the project: substrate, building height, cladding and the chosen fixing system.

Fixing systems

Riveted or adhesive

Kit contents
SikaTack® Panel adhesive system

Proven by tests and time

  1. 20+ years

    On the facade without loss of strength

    A facade in Interlaken (Switzerland), installed in 2000–2002. In 2023 the adhesive joint was tested: tensile strength 2.17 MPa, 100% cohesive failure in the adhesive — values match the product data sheet.

    Sika report, October 2023
  2. intensity 9+

    Seismic tests

    6 mm HPL panels on adhesive fixing (including SikaTack® Panel) withstood loads equivalent to an earthquake of intensity 9 and above on a shake table — with no damage or residual deformation.

    JSC “KazNIISA”, Almaty, 2021 · the conclusion applies to the tested design solutions
  3. 1.40 MPa

    Adhesive control tests

    Nominal strength 1.38–1.40 MPa against a requirement of at least 0.6; elongation at break 200–210% against a requirement of at least 150 (GOST 26589-94).

    NATsEKS test reports No. 100/1/K and 100/2/K dated 29.12.2025
  4. −40…+90 °C

    Adhesive data sheet

    A one-component polyurethane adhesive: tensile strength 2.5 MPa, elongation at break 500%. The 12 × 3 mm tape sets an even joint and holds the panel for about a day while the adhesive gains strength.

    Sika technical data
→
Properties

Sun, wind and temperature swings

Data from the technical catalogue of “Zenith” facade panels.

01

Does not fade in the sun

UV-protective layer of facade decors.

02

Rain, snow and temperature swings

2 hours of boiling — no visible changes; climatic shock to EN 438-2-19 — the panel keeps its strength.

03

Panel fire safety

The panel’s fire class is in the technical data sheet, on request. This is the class of the panel, not of the whole facade system.

04

Hail and impacts

Density from 1.4 g/cm³, flexural strength from 100 MPa — the panel withstands ball and hail impacts.

05

Dirt doesn’t soak in

Non-porous surface: dust and dirt wash off with water and ordinary detergents.

06

The facade breathes

Air in the ventilation gap behind the panel removes moisture from the insulation — the wall stays dry and the insulation keeps working.

→
Fixing details

Rivets or adhesive — in section

Horizontal section of the ventilated facade: from the wall anchor to the face panel.

Your facade We’ll calculate the substructure, fixings and panels for your area Calculate a facade
Turnkey

One contractor — from measurement to sign-off

One manager at every stage, status updates on Telegram.

Calculation

Free measurement when you buy HPL from UZHPL — anywhere in Uzbekistan. Or a calculation from photos and drawings.

Design and estimate

Panel layout, cutting map and an itemised estimate.

Supply

Panels and substructure delivered to site in batches to the construction schedule.

Installation and warranty

Our own crew, acceptance by sign-off, 12-month installation warranty.

Projects

For which buildings

Residential complexes

Delivery in batches to the general contractor’s schedule.

Business centres

Strict solid colours, metallics, entrance areas.

Malls and hotels

Bright and textured decors, lighting.

Private houses

Wood and stone without painting or impregnation.

Decors in person

Facade decors — touch them in person

Colours are not shown accurately on screen. Some decors can be seen in person at the showroom on 235 Parkent St.

Why HPL

Comparison with alternatives

For a ventilated rainscreen facade. Indicative values.

HPL panelsAluminium compositePorcelain stonewareFibre cement
Weight, kg/m² (8 mm)from ~11 (density from 1.4 g/cm³)~5,5~22~16
Impact resistanceHighDentsChipsMedium
Decor selectionUV-resistant “Zenith” facade decorsdepends on the manufacturerdepends on the manufacturerdepends on the manufacturer
Resistance to UV and temperature swingsYes, UV-protective layer of facade decorsYesYesNeeds painting
Fire safetyB-s1,d0Depends on the coreNon-combustibleNon-combustible
Installation speedFastFastSlowMedium
Processing on siteCut and drilled with ordinary tools; the edge needs no bandingCassettes are bent and milled in the workshopDiamond tools, risk of chippingLots of dust, the edge is painted
Fixings on the face of the facadeInvisible (adhesive) or rivets in the decor colourHidden in the cassetteClips are usually visibleRivets or adhesive
Dirt and graffitiA non-porous surface — washes off with water and detergentWashes offTiles wash clean, open joints darkenDepends on the factory coating
Who is responsible for the systemUZHPL: panel, substructure, fixings and installation — one contractUsually different suppliers for the panel, substructure and crew
Projects

UZHPL facades

All projects
Questions and answers

Facade questions

Didn’t find an answer? Message us on Telegram — we reply within one working day.

How much does a turnkey HPL facade cost?

It depends on thickness, decor, fixing system and facade complexity. For a guide, see the calculator above. An exact estimate follows measurement or drawings, usually within 24 hours; for complex projects we agree on the timing.

How does the riveted system differ from the adhesive one?

Riveted is mechanical fixing with visible heads in the decor colour, easy to repair. Adhesive is concealed fixing with a monolithic look, but it needs the right conditions for the adhesive to cure.

Which insulation should I choose?

Thickness is determined by the design and thermal calculation. Typically: 50 mm for commercial buildings and warm regions, 80 mm for residential buildings, 100 mm for enhanced thermal protection.

Can I buy just the materials?

Yes — switch off installation in the calculation or put the items together in the catalogue. The cutting map is free when you order panels.

More about cutting

What warranty do you give on facade installation?

Installation is covered for 12 months under the contract: geometry, fixings, no delamination; we fix installation defects at our own expense.